N
Loading 3D viewLoading data
The 3D view is not available on this device.

Gotthard tunnel traffic live

Updated 18:34 · Source: FEDRO
Get the app
EN

Situation at the Gotthard

There is currently no queue at the North portal (Göschenen). There is currently no queue at the South portal (Airolo). The Gotthard road tunnel is open. The Gotthard Pass is closed (Winter closure). Updated: 18:34, source: FEDRO.

Current status

Waiting time history

One measurement every 3 minutes · click the curve to jump to that moment

Traffic on the way to the north portal

FEDRO counting stations in driving order, 15-minute average. The colour shows speed compared with normal.

    flowingheavyslowqueue
    Vehicles per hour over time

    When are the queues longest?

    Trains & holidays

    Direct IC/EC Zurich – Lugano · school and public holidays by origin of traffic

    IC/EC, direct or with one change · 1st and 2nd class occupancy, SBB forecast
    School & public holidays
    Share of the population

    Weather along the route

    MeteoSwiss · last 30 min

    Frequently asked questions about the Gotthard

    How up to date is the Gotthard queue information?

    Every 3 minutes the site collects the reports and counter data of the Swiss Federal Roads Office (FEDRO) and stores them in its own database. At the top you can see when the latest data is from. The timeline lets you review the last hours and days.

    What is the difference between the north and south portal?

    The north portal is at Göschenen in the canton of Uri, where the queue forms for traffic heading south to Ticino. The south portal is at Airolo in Ticino, where the queue forms for traffic heading north. Use the switch at the top to choose the side that matters for your journey.

    When are the Gotthard queues longest?

    The longest queues usually form on holiday weekends and before public holidays such as Easter, Ascension and Whitsun: southbound at the start of the holidays and northbound at the end. The analysis “When are the queues longest?” shows the pattern by weekday and hour from our own measurements.

    Why is there a queue when traffic is moving in the tunnel?

    The tunnel currently has a single tube with one lane in each direction. In heavy traffic, a metering system at the portal only lets in as many vehicles as the tunnel can safely take. Lorries also keep a long distance apart. That is why a long queue can stand at the portal while traffic flows in the tunnel.

    What are the alternative routes to the Gotthard?

    The main ones are the Gotthard Pass, when it is open, and the A13 over the San Bernardino. You will find both counters in the traffic section. In a long queue it is also worth checking the direct Zurich – Lugano trains, listed on this page with their occupancy forecast.

    When is the Gotthard Pass open?

    The pass, at 2106 m, is closed in winter, usually from late autumn until spring or early summer. The dates change every year with the snow. The current status of the pass and the Tremola is shown at the top.

    Is there a toll for the Gotthard tunnel?

    There is no separate tunnel toll. The tunnel is part of the A2 motorway, which requires the Swiss motorway vignette. It is 16.9 km long.

    When will the second Gotthard tube open?

    Switzerland is building a second tube. According to FEDRO’s current planning it is due to open in 2030. The existing tube will then be renovated. There will still be one lane per direction, and capacity is not meant to increase.

    Are the waiting times guaranteed?

    No. The figures are based on unverified raw data from the authorities and come without guarantee. If no waiting time is reported, it is estimated from the queue length (about 12 minutes per kilometre) and marked as such. Signs and instructions on site always take priority.

    Gotthard traffic on your website

    For hotels, campsites, clubs and blogs: a widget with waiting time and queue for both portals. Pick a look, copy the code, paste it in.

    Build your widgetFree, no sign-up, no ads